OPERATING AND MAINTENANCE INSTRUCTIONS
FOR PC/E-300 & PC2G CLOSE-COUPLED END
SUCTION CENTRIFUGAL PUMPS
The THRUSH End Suction Centrifugal Pump has been carefully assembled and factory tested to
provide years of trouble free service. In order to insure the service intended, the following
information is provided to enable proper installation, operation and maintenance of this product.
INSTALLATION
LOCATION
The pump should be located as close to the liquid source as possible so that the suction line can
be short and direct. It should be located in a clean, open area, where it is easily accessible for
inspection, lubrication and repair. Pumps installed in dark, dirty areas or in cramped locations are
often neglected which can result in premature failure of both the pump and the driver.
Adequate provisions should be made for electrical wiring to the pump motor. A switch and an
overload protection should be installed near the pump unless it is impractical. The electrical
conduit should be positioned in such a way as to preclude the possibility of moisture entering the
conduit or the motor and causing short circuits.
FOUNDATION
The foundation must be sufficiently rigid to absorb any vibration and stress encountered during
pump operation. A raised foundation of concrete is preferable for most floor-mounted pumps.
The raised foundation assures a satisfactory base, protects against flooding, simplifies moisture
drainage and facilitates keeping the area clean.
The pump should be firmly bolted to the foundation, whether it is a raised concrete base, steel
work wall, or structural member. The mounting bolts or studs should be accurately located per
the applicable THRUSH dimension sheet. Foundation bolts should be enclosed by a sleeve 2 to
4 diameter larger than the bolt to allow movement for proper alignment with the pump mounting
holes. Refer to Figure 1. If the pump is to be mounted on steel work or other structure, adequate
support should be provided to the base plate or the structure could produce excessive strain on
the pump casing and piping and seriously affect alignment of the pump and driver.
Seitenansicht 0
1 2 3 4 5 6

Inhaltsverzeichnis

Seite 1 - SUCTION CENTRIFUGAL PUMPS

OPERATING AND MAINTENANCE INSTRUCTIONS FOR PC/E-300 & PC2G CLOSE-COUPLED END SUCTION CENTRIFUGAL PUMPS The THRUSH End Suction Centrifugal Pum

Seite 2

Figure 1 MOUNTING The pump unit should be set on the foundation, being careful not to damage the threads on the foundation bolts. The flexible co

Seite 3

SUCTION PIPING Long radius elbows should be used in place of standard elbows wherever possible, because of their superior flow characteristics. Elbow

Seite 4 - MAINTENANCE

between the check valve and the pump, or the priming can be done with a bucket and funnel. It is important to completely fill the suction pipe and pu

Seite 5

4. Remove all relief, cooling, flushing or drain lines, if present, from the pump. 5. Remove capscrews (30) from bracket (15) and pull bracket ass

Seite 6 - SERVICE

than the diameter of the shaft. Spring tension will probably prevent the sleeve from remaining in position axially until the impeller is locked again